Flooring work to a school dinning area in Greenford West London that was carried out on behalf of Syntec Projects. Once the existing flooring had been removed a Latex screed was applied to achieve a clean and smooth sub-floor. Linoleum was fitted with a set in , PVC skirting around the perimeters.
The results are excellent.
Before & after
![Cardinal School, Greenford, West London Linoleum Flooring](https://metroflooring.co.uk/wp-content/uploads/2021/12/Cardinal-School-Greenford-West-London-Linoleum-Flooring2-1024x768.jpg)
![Cardinal School, Greenford, West London Linoleum Flooring](https://metroflooring.co.uk/wp-content/uploads/2021/12/Cardinal-School-Greenford-West-London-Linoleum-Flooring-1024x683.jpg)